Al Hamra Power Plant - Storage Tanks
Fabcon has successfully completed theTankage project for Al Hamra power, in Ras Al Khaimah - UAE.
The contract involved the following Tanks:
- Fuel Oil Tank, 15.0m dia x 14.5 m height (CS)
- DM Water Tank, 12.0m dia x 10 m height (SS 316L)
- Fire Water Tank, 10.om dia x 7.0 m height (CS)
The job was completed within a tight schedule of 12 weeks from award of contract, including Design, Engineering, Procurement, Pre-fabrication, Erection, Hydrostatic test and Final Painting.
|